County Line Road, Bridge Over Branch at L.M. 0.27
The work includes demolition of existing bridge, the construction of new box bridge, installation of guardrail, coordination with utility relocation, the construction of base and pavement and pavement marking, installation of temporary erosion and sediment control structure, EPSC maintenance, and traffic control. The total project length is 0.049 miles.
Status
Bidding Closed
Bid Date4/10/19 3:30pm
Company & Contacts
A2H, Inc.
Laurie Poe
901-372-0404
Location
Crockett County, TN