County Line Road, Bridge Over Branch at L.M. 0.27
The work includes demolition of existing bridge, the construction of new box bridge, installation of guardrail, coordination with utility relocation, the construction of base and pavement and pavement marking, installation of temporary erosion and sediment control structure, EPSC maintenance, and traffic control. The total project length is 0.049 miles.
Plan Holders
Date | Company | Contact |
3/5/19 8:01 am |
Dement Construction Company, LLC
96 Smith Lane Jackson, TN 38301 |
Cindy Taylor
Administrative Assistant
Tel: 731-424-6306
Fax: 731-256-1308
|