T.E. Maxson Wastewater Plant Lab Modifications

The Project consists of the minor demolition and alterations construction of existing building features and utilities, and the removal and reinstallation of existing Owner equipment in the building areas as described in the drawings and project manual.
Bid Documents (click to expand/collapse)
Name Size
001 COVER 476.3 KB
002 G0.1 582.1 KB
003 G1.0 284.8 KB
004 G2.0 13.5 MB
005 A0.1 269.6 KB
006 A0.2 264.5 KB
007 A0.3 283.5 KB
008 M1.1 627.5 KB
009 M2.1 304.7 KB
010 M2.2 621.9 KB
011 M3.1 312.8 KB
012 M3.2 230.8 KB
013 P1.1 407.2 KB
014 E0.1 214.2 KB
015 E1.1 225.7 KB
016 E2.1 261.7 KB
017 E2.2 182.7 KB
018 E3.1 210.3 KB
019 E5.1 225.5 KB