T.E. Maxson Wastewater Plant Lab Modifications
The Project consists of the minor demolition and alterations construction of existing building features and utilities, and the removal and reinstallation of existing Owner equipment in the building areas as described in the drawings and project manual.
Bid Documents
(click to expand/collapse)
Name | Size | ||
Project Manual | 1.2 MB |