Wastewater Treatment Expansion Tri-Cities
Scope of demolition and removal work is indicated on drawings . B. Hazardous Substances: Discovery of a suspected dangerous or hazardous substance during construction stops construction operations and may seriously delay a project. Contractors often encounter asbestos, lead, polychlorinated biphyenyls (PCBs), and similar hazardous materials on their construction projects. Because the use of those materials was common until recently, they are often found on renovation projects involving older buildings. AIA Document A201 outlines procedures contractors must follow when suspected dangerous or hazardous substances are uncovered during construction. If the suspect material proves to be a dangerous or hazardous substance, a contractor is not permitted to resume construction operations until the material has been rendered harmless or has been lawfully removed from the site. C. Scope of alterations work is indicated on drawings.
Plan Holders
Date | Company | Contact |
7/6/25 2:46 am |
Dodge Data & Analytics
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 |
Jayalakshmi L
Tel: 413-376-7032
Fax: 609-336-2767
|
7/3/25 9:59 pm |
PWXPress
1900 Coffeeport Rd 1900 Coffeeport Rd Jacksonville, FL 32208 |
Mary Miller
Tel: 4086768941
|
7/3/25 4:56 pm |
Southern Sales Company
2937 Kraft Drive Nashville, TN 37204 |
Brian Williams
Engineered Sales
Tel: 6152073441
|
7/4/25 1:25 pm |
TyBe Company, LLC
1715 Templeton Loop Newbern, TN 38059-3081 |
Tyler Orr
Tel: 7316272744
|