2020 CDBG Sewer Infrastructure Repair (Kenton, TN) - Contract 1 - Cured in Place Pipe
The project consists of the repair and rehabilitation of sanitary sewer infrastructure as described in the drawings and project manual (CIPP).
Addenda
(click to expand/collapse)

Name | Size | |||
2021-07-29 - 20104 - Contract 1 CIPP Addendum 1 (with attachment) | 1.4 MB |