2017 CDBG Water System Improvements
Construction of 6" water lines by open cut and directional bore. Installation of a master meter, pressure reducing control valves, and insertion valves.
Addenda
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| 2020-01-08 - 17122 - Addendum #1 with Attachments | 3.8 MB |

