Halls Elementary School and Halls Jr. High SRTS
The project includes construction of a concrete sidewalk and related drainage improvements, crosswalk striping, ADA improvements, signage, and a pedestrian safety rail. Project length is 0.12 miles.
Bid Documents
(click to expand/collapse)

Name | Size | ||
001 COVER | 1.0 MB | ||
002 SHEET 1A | 238.1 KB | ||
003 SHEET 2 | 445.2 KB | ||
004 SHEET 2D | 319.1 KB | ||
005 SHEET 2E | 1.0 MB | ||
006 SHEET 3A | 590.5 KB | ||
007 SHEET 3B | 630.0 KB | ||
008 SHEET 4 | 805.6 KB | ||
009 SHEET 4A | 526.3 KB | ||
010 SHEET 5 | 605.8 KB | ||
011 SHEET 6 | 537.7 KB | ||
012 SHEET 7 | 448.7 KB |