2017 CDBG Water System Improvements

Construction of 6" water lines by open cut and directional bore. Installation of a master meter, pressure reducing control valves, and insertion valves.
Bid Documents (click to expand/collapse)
Name Size
001 COVER 205.4 KB
002 C0.0 3.3 MB
003 C1.0 914.8 KB
004 C1.1 425.5 KB
005 C2.0 1.1 MB
006 C2.1 1.1 MB
007 C3.0 1.1 MB