Roberts-Matthews Highway, Bridge Over Falling Water River at L.M. 6.34
The work to be done consists of bridge demolition, bridge construction, grading & approaches, roadwork, guardrail installation, paving, pavement marking, erosion prevention & sediment control and traffic control.
Addendum
(click to expand/collapse)
Name | Size | |||
16110 - Adddendum No. 2 | 2.0 MB | |||
16110 - Addendum No. 1 | 14.6 MB |
Clarifications
(click to expand/collapse)
Name | Size | |||
Clarification 1 | 71.6 KB |