Rebid: Robert Sibley Airport Terminal and Hanger Rehabilitation for McNairy Co. Airport Authority

This project will consist of rehabilitating the roofs of hangars #1 & #2 and existing lean to structures, along with re-roofing and energy upgrades for the terminal building.
Re-bid Documents (click to expand/collapse)
Name Size
001 COVER 644.2 KB
002 G0.1 2.7 MB
003 A1.1 258.7 KB
004 A1.2 1.6 MB
005 A1.3 570.0 KB
006 A1.4 10.2 MB